Equivalent PR: every dual-string MPPT string brought up to the single-string reference, then
capped at each inverter's ceiling (185 kW Γ its own setpoint) and at the site export limit.
Same contract intervals and E_ideal as the real PR.
PR (contract)
β
PR (equivalent)
β
Difference
β
Recoverable energy
β
Missing DC, all bins
β
β¦of which while limited
β
String data coverage
β
Daily PR β actual vs equivalent
One pair of points per day (axis zoomed to the data, not from zero). The gap between them is the energy the dual-string MPPTs
could have added after every ceiling is applied.
Inverters
Dual Γ· single: median ratio of dual-string to single-string string power (bins above
200 W/mΒ²), split by whether the inverter/site was at a ceiling. Allocation = strings
match when unconstrained and only fall behind while limited (nothing to recover).
Real loss = they fall behind even when nothing is limiting. Click a row for detail.
Inverter β
Each dot is one 15-min bin: x = single-string reference power, y = dual Γ· single. If the gap is
power-limit allocation, the dots stay near 1.0 until a ceiling is hit and drop only in the
limited classes; a real loss drops in the unconstrained class too.
Inverter AC power: actual, equivalent, and the ceiling it was held to.